Manual Pig Carcass Chilling Rail


Manual Pig Carcass Chilling Rail

In a pig plant, the Manual Pig Carcass Chilling Rail serves as a manual overhead rail section for moving dressed pig carcasses through chilling, storage or dispatch. The final build must match the actual product load, room layout and cleaning routine at site. The HT listing supplies reference data for the offered arrangement; those figures are reproduced below for comparison. For export quotations, confirm voltage, materials, guarding, spare parts and documentation before the purchase order is released.

Contact Us

Product Overview

In a pig plant, the Manual Pig Carcass Chilling Rail serves as a manual overhead rail section for moving dressed pig carcasses through chilling, storage or dispatch. The final build must match the actual product load, room layout and cleaning routine at site. The HT listing supplies reference data for the offered arrangement; those figures are reproduced below for comparison. For export quotations, confirm voltage, materials, guarding, spare parts and documentation before the purchase order is released.



Working Principle

Trolleys roll along the supported rail under manual push or gravity. Switches, stops and gradients guide each carcass into the selected room or onward route while maintaining hanging separation. Operators need a clear stop‑and‑recovery routine for a jam, tool change or hygiene break.

Main Features

  • Rail load and support spacing engineered for the duty

  • Smooth trolley travel

  • Switches and stops for route control

  • Corrosion‑resistant finish options

  • Cleaning clearance around the track

  • Expandable room layout

Technical Specifications

ParameterReference Value / Buyer Check
ModelHT‑P117‑III
ApplicationWhich main used to hang pig carcass for bleeding, evisceration, chilling, boneless and so on
Rail Height2700‑3300mm
Push block distance600‑800mm
Component and material1) Hot galvanized or stainless steel 10# double channel steel 2) Hot galvanized or stainless steel 10# I‑Beam 3) Hot galvanized or stainless steel refined steel casting hanger 4) Connecting bolt 5) φ60*4mm 304 stainless steel tube rail (Rube rail) 6) 40X40X4mm 304stainless steel dual rail (Dual orbit)
Quotation controlProvide room layout, rail height, carcass load, trolley drawing, required spacing, support steel and door locations. Refrigeration duty is a separate project calculation.

Reference configuration transcribed and normalized from the cited HT product page; confirm the final quotation and approved drawing.

Application

The usual application is pig chill rooms, equalization storage, small cutting plants and dispatch areas. It can be specified for a new line or adapted to a retrofit, provided that the existing supports, working heights, utilities and control signals are measured on site. Plants handling several pig sizes should state the full range rather than quoting only an average.

Application Case

Illustrative reference case-A regional pork processor planning for 120 pigs per hour places the manual pig carcass chilling rail between the relevant upstream and downstream stations. Before fabrication, the project team freezes the interface drawing, utility points and operator access. The acceptance check covers dry running, representative‑load operation, emergency stops, cleaning access and a spare‑parts handover.

Advantages

  • 1. Fits into a defined process stage, which makes line balancing and internal linking easier.

  • 2. Project‑specific dimensions reduce awkward field modifications at installation.

  • 3. Service points and replaceable wear parts can be agreed before shipment.

  • 4. Hygiene and drainage requirements can be reviewed with the equipment layout.

  • 5. Reference source data remains visible instead of being converted into unsupported marketing claims.

Manual Pig Carcass Chilling Rail FAQ

  • What information is needed to quote the Manual Pig Carcass Chilling Rail?

    Provide room layout, rail height, carcass load, trolley drawing, required spacing, support steel and door locations. Refrigeration duty is a separate project calculation.
  • Can it be connected to an existing slaughter line?

    Usually yes, but a retrofit needs measured drawings. Share the rail or conveyor interface, floor levels, travel direction, available space, utilities and current control method before engineering starts.
  • Which spare parts should be ordered with the machine?

    Start with the normal wear and hygiene parts for this duty: bearings, seals, sensors, chains or belts, nozzles, blades, scrapers, pneumatic parts and electrical protection devices as applicable. The supplier should issue a model-specific list.
  • Are the published technical figures final?

    No. The table records reference information from the citedHTpage. Capacity, power, dimensions, material grade and utilities must be confirmed on the quotation and approved drawing.
  • How should the equipment be accepted after installation?

    Use a documented site-acceptance test covering alignment, guards, emergency stops, interlocks, dry running, representative load, cleaning access, leakage or drainage, operator training and delivery of manuals and spares.
request a quote

Complete Control Over Products Allows Us To Ensure Our Customers Receive The Best Quality Prices And Service. We Take Great Pride In Everything That We Do In HUATAO GROUP !

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.